Egra Municipality
Dial: 03220 244371
Tele-fax: 03220 244371
Mail:<egramunicipality@gmail.com>

Citizen's Charter

  • # Services List ULB Name days Limit Accuracy
    1 Approval of Site Plan and Building Plan for residential buildings having height of 14.5 meteres and above. Egra Municipality 30 days
    2 Sanction of Site Plan and building plan of residential buildings having height of less than 14.5 meters Egra Municipality 30 days
    3 Sanction of Site Plan and building plan for commercial or mixed used buildings Egra Municipality 30 days
    4 Sanction of Site Plan and building plan for institutional buildings. Egra Municipality 30 days
    5 Sanction of plan for addition, alteration or repairing of old buildings. Egra Municipality 30 days
    6 Supply of water through WaterTank Egra Municipality 1 days
    7 Initiating actions against illegal buildings/building activities Egra Municipality 15 days
  • # Services List ULB Name days Limit Accuracy
    1 Issuance of Birth and Death Certificate Egra Municipality Within 3 days after receiving report from the concerned Health Centre/ Hospital/Nursing Home - if reported within 21 days from occurance of Birth and Death
    2 Birth Certificate and Death Certificate in case of domestic birth or death Egra Municipality 7 days after receiving report from the concerned Health Centre/ Hospital/Nursing Home - if reported within 21 days from occurance of Birth and Death
    3 Issuance of copy of Birth and Death Certificate Egra Municipality Within 7 days, if recorded after birth and death.
    4 Issuance of Cremation Certificate Egra Municipality At the time of cremation from the crematorium/burial ground, if cremated or buried, as the case may be, in a crematorium/burial ground of a Urban Local Body.
    5 Correction of records related to Birth or Death Certificate Egra Municipality 10 days
    6 Supply of water through WaterTank Egra Municipality 1 days
    7 Initiating actions against illegal buildings/building activities Egra Municipality 15 days
  • # Services List ULB Name days Limit Accuracy
    1 New Enlistment License Certificate Egra Municipality 30 days
    2 Renewal License Egra Municipality 10 days
  • # Services List ULB Name days Limit Accuracy
    1 Replacement of defective street lamp and repairing(Minor) Egra Municipality 7 days
    2 Installation of new street light Egra Municipality 7 days from the date of completion of installation of poles and connection by the electric supply agency.
  • # Services List ULB Name days Limit Accuracy
    1 Garbage Cleaning. Egra Municipality 7 days
    2 Cleaning of drains Egra Municipality 7 days
    3 Cleaning of chocked drain Egra Municipality 2 days
    4 Cesspool tank wash Egra Municipality 10 days
    5 Cleaning of garbage after receipt of Special Cleansing Charge Egra Municipality 1 days
    6 Removal of materials dumped on the public throughfare. Egra Municipality Within 2 days from the date of expiry of term, as determined by the Urban Local Body, of the owner of such material to remove.
Top

Style Options

Color Scheme

Show Top Bar

ShowHide

Top Bar Style

DefaultColored

Layout

WideBoxed

Dark & Light

LightDark

Navigation Color

LightDark

SupMenu Color

LightDark

Style Options

Color Scheme

Show Top Bar

ShowHide

Top Bar Style

DefaultColored

Layout

WideBoxed

Dark & Light

LightDark

Navigation Color

LightDark

SupMenu Color

LightDark